
Pneumatic Tire Roller
The advanced full-hydraulic system delivers smooth, responsive handling and stepless speed regulation, reducing operator workload during long shifts.
On-site adjustable ground pressure enables the roller to surface-seal asphalt or achieve deeper compaction of base materials through simple ballast changes.
A maximum operating mass of 16,000 kg provides powerful static and kneading action for high-density compaction and superior surface closure.
The dedicated wheel arrangement ensures full coverage across the entire compaction path and produces the kneading effect required for sealing surfaces and increasing density.
Multiple pneumatic tires evenly distribute pressure to eliminate weak points and protect mat integrity on critical asphalt pavements.
Pneumatic tires apply gentle yet effective force, minimizing surface marks and aggregate damage, making them ideal for final finishing.
Adjustable tire inflation allows operators to control compaction depth and energy on site without changing equipment.
Flexible pneumatic tires maintain effective compaction on uneven ground, soft bases, and rough surfaces where rigid drums may struggle.
The responsive full-hydraulic system provides excellent control during sharp turns and frequent direction changes, enabling precise compaction patterns.
A dedicated compaction speed range for high-quality work and a higher travel speed for rapid repositioning between sites.
A 2270 mm compaction width and overlapping wheel pattern ensure consistent edge-to-edge density, eliminating weak transition zones.
The reliable 105 kW Weichai engine (Tier 2 / China Stage II) delivers dependable performance, simple maintenance, and efficient fuel consumption.
The P166 full-hydraulic pneumatic tire roller combines smooth hydraulic control, adjustable ground pressure, a 4+5 tire layout, and a robust 16-ton operating weight to deliver uniform, asphalt-friendly compaction across a 2270 mm width, powered by a reliable 105 kW Weichai engine for durable, high-quality road construction and surface finishing.
| Pneumatic Tire Roller Specifications | |
| Model | P166 |
| Maximum Operating Weight (kg) | 16000 |
| Ground Pressure (kPa) | 200-400 |
| Compaction Width (mm) | 2270 |
| Gradeability (%) | 20 |
| Speed I (km/h) | 0-7 |
| Speed II (km/h) | 0-15 |
| Turning Radius (mm) | 7500 |
| Tire Specification (Smooth) | 11.00-20 |
| Number of Tires (Front/Rear) | 4/5 |
| Engine Brand | Weichai |
| Emission Standard | China Stage II / Tier 2 |
| Engine Power (kW) | 105 |
| Dimensions (mm) | 5200 × 2270 × 3350 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.