
Pneumatic Tire Roller
Consistent ground contact and uniform pressure distribution ensure high-quality, repeatable compaction across the full working width.
Pneumatic tire compaction improves surface sealing and density, reduces water infiltration, and extends pavement service life.
The gentle compaction action minimizes vibration effects on adjacent structures and improves operator comfort.
The wide compaction width and stable travel performance reduce overlapping passes and improve productivity across the entire job site.
Strong power reserve and reliable traction enable stable operation on slopes up to 20%, ensuring safety and continuity in slope projects.
Reasonable structural design and reliable key components reduce routine maintenance workload and extend machine service life.
Ergonomic controls, stable driving performance, and low vibration create a fatigue-resistant operating experience.
A stable chassis, responsive hydraulic control, and reliable braking enhance safety during construction and maneuvering.
Suitable for base course, subbase, asphalt layer, and landfill compaction — versatile for road and municipal projects.
Equipped with a low-consumption Weichai engine compliant with Tier 2/China II emission standards, delivering strong power and lower fuel consumption.
The P206 full hydraulic pneumatic tire roller combines full hydraulic efficiency with pneumatic tire compaction to deliver uniform, pavement-friendly results across diverse applications, improving construction quality, extending pavement life, and providing a versatile solution for modern road and infrastructure projects.
| Pneumatic Tire Roller Specifications | |
| Model | P206 |
| Maximum Operating Weight (kg) | 20000 |
| Ground Contact Pressure (kPa) | 200-440 |
| Compaction Width (mm) | 2270 |
| Gradeability (%) | 20 |
| Speed I (km/h) | 0-7 |
| Speed II (km/h) | 0-15 |
| Turning Radius (mm) | 7500 |
| Tire Specification (Smooth) | 11.00-20 |
| Number of Tires (Front/Rear) | 4/5 |
| Engine Brand | Weichai / Weichai |
| Emission Standard | China II / Tier 2 |
| Engine Power (kW) | 105 |
| Dimensions (mm) | 5200 × 2270 × 3550 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.