
Pneumatic Tire Roller
A 30-ton operating weight achieves greater compaction density and deeper compaction layers for heavy-duty road projects.
A 2750 mm compaction width reduces overlapping passes and significantly increases daily construction output.
The 5-front, 6-rear tire arrangement ensures full-width compaction without missed areas or uneven density.
Delivers stable power output under heavy loads and harsh working conditions.
Meets stricter environmental suitability emissions standards for global and urban projects.
Adjustable ground pressure ensures powerful compaction capability on base layers and asphalt surfaces.
Heavy-duty frame design and reinforced components improve reliability and extend service life under long-term intensive use.
Optimized weight distribution and tire configuration provide stable travel and strong anti-slip performance.
Full hydraulic drive enables smooth starting, braking, and steering, reducing operator fatigue and improving accuracy.
Designed for highways, airports, ports, and large infrastructure requiring high compaction quality.
The P306H-2 full hydraulic pneumatic tire roller combines a 30-ton heavy-duty structure, 140 kW Weichai power, and a full hydraulic system to deliver uniform, deep, and surface-appropriate compaction across a 2750 mm width, making it ideal for large infrastructure projects that require high compaction quality and long-term reliability.
| Pneumatic Tire Roller Specifications | |
| Model | P306H-2 |
| Maximum Operating Weight (kg) | 30000 |
| Ground Pressure (kPa) | 250-460 |
| Compaction Width (mm) | 2750 |
| Gradeability (%) | 20 |
| Speed I (km/h) | 0-14 |
| Speed II (km/h) | 0-14 |
| Turning Radius (mm) | 9000 |
| Tire Specification (smooth) | 11.00-20 |
| Number of Tires (front/rear) | 5/6 |
| Engine Brand | Weichai&/Shangchai |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.