
Pneumatic Tire Roller
Equipped with a low-emission, high-efficiency Shangchai engine that meets global environmental standards for urban and international projects.
The stable and robust frame design ensures reliable performance under heavy loads and long working hours.
5 front and 6 rear tires provide full-coverage compaction, eliminating uncompacted areas and ensuring uniform density.
The 2750mm working width reduces repeated passes and greatly improves daily construction productivity.
The adjustable pressure range supports both base layer compaction and asphalt surface finishing.
Precise hydraulic control ensures stable starting, steering, and braking, reducing operator fatigue.
Optimized weight distribution and tire configuration provide strong grip even on wet or inclined surfaces.
High-strength components and rational structural design reduce maintenance frequency and extend machine service life.
User-friendly control layout and low-vibration design improve operating comfort during long shifts.
Suitable for highways, airports, ports, municipal roads, and large infrastructure requiring high compaction quality.
The P307H full hydraulic pneumatic tire roller pairs a 30-ton heavy-duty structure with a Tier 4 / Stage IV Shangchai engine and an advanced hydraulic system to deliver uniform, deep, and environmentally friendly compaction across a 2750mm width, making it ideal for large infrastructure projects that demand high efficiency, durability, and road-friendly performance.
| Pneumatic Tire Roller Specifications | |
| Model | P307H |
| Maximum Operating Weight (kg) | 30000 |
| Ground Contact Pressure (kPa) | 250-460 |
| Compaction Width (mm) | 2750 |
| Gradeability (%) | - |
| Speed I (km/h) | 0-14 |
| Speed II (km/h) | 0-14 |
| Turning Radius (mm) | 9000 |
| Tire Specification (Matte) | 11.00-20 |
| Number of Tires (Front/Rear) | 5/6 |
| Engine Brand | Weichai |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.