
Wheeled Excavator
Adopts a well-known domestic brand engine with strong power to meet high-efficiency work requirements.
Precise matching design and advanced energy-saving control effectively reduce fuel consumption.
Equipped with a new cooling fan and large muffler to reduce operating noise.
Advanced turbocharging technology greatly improves high-altitude adaptability.
Unique funnel-shaped fan shroud enhances air intake and heat dissipation, ensuring continuous efficient operation.
Premium components: the main pump, main valve, swing motor, travel motor, cylinders, and pilot valve all use world-renowned brand parts to ensure stable quality.
Integrates the latest technology to reduce energy consumption and achieve faster response.
Powerful and precise swing control optimizes vibration absorption for stable swing stops, increases torque reserve, and generates stronger swing power.
Cushion cylinders: the boom, arm, and bucket cylinders are all designed with cushioning structures to reduce vibration, lower noise, and extend service life.
Dual-pump confluence technology increases oil flow to the working cylinders and greatly improves working speed.
Reinforced chassis, hydraulic power steering system, and wheel reduction axle improve flexibility and durability.
Key hinge positions use forged structures to relieve stress and enhance wear resistance.
Integrally welded boom and arm, processed by boring and shot peening, enhance structural strength, avoid welding cracks, and extend the service life of pins and bushings.
The bucket cutting plate is made of special wear-resistant steel plate, paired with durable bucket teeth and side teeth, suitable for heavy-duty operations.
Thickened steel plates and side reinforcement plates further improve overall wear resistance.
Flat-bottom bucket ensures a smooth and level ground finish.
Full-view wide-visibility design with enlarged front, side, and rear windows reduces blind spots for safer and more efficient operation.
Large skylight improves upward visibility and ventilation; tempered glass windows with sunshades prevent direct sunlight.
All controls are ergonomically arranged for easy and comfortable operation.
Lightweight control handles relieve fatigue during long working hours.
Fully enclosed deluxe cab with LCD display panel and comfortable seat.
Standard air conditioning and heating provide fast cooling and heating for a pleasant working environment.
Large multi-function LCD monitor displays real-time data such as engine speed, water temperature, and oil pressure, making equipment status monitoring clear at a glance.
Centralized control panel with touch buttons for simple and convenient operation.
Built-in GPS positioning system supports remote diagnostics, fault warnings, and automatic maintenance reminders.
Oil filter, pilot filter, fuel filter, and water separator are located at ground level for easy inspection and replacement.
Large-capacity fuel tank supports long continuous operation and extended refueling intervals.
Extra-large toolbox provides ample space for spare parts and maintenance tools.
High-quality core components extend service intervals and reduce downtime maintenance frequency.
| Performance parameters | |
| Bucket capacity (m³) | 0.8 |
| Swing speed (rpm) | 0-12 |
| Maximum climbing angle (°) | 25 |
| Maximum bucket digging force (KN) | 100 |
| Maximum arm digging force (KN) | 70 |
| Engine model | B5.9CS4 |
| Power/speed (KW/rpm) | 110/2200 |
| Tire model | 10.00-20 |
| System pressure (MPa) | 32 |
| Working range | |
| Maximum digging height (mm) | 9200 |
| Maximum dumping height (mm) | 6620 |
| Maximum digging depth (mm) | 5350 |
| Maximum vertical digging depth (mm) | 4850 |
| Maximum digging radius (mm) | 8480 |
| Minimum swing radius (mm) | 2720 |
| Maximum dozer ground clearance (mm) | 420 |
| Maximum dozer cutting depth (mm) | 85 |
| Overall dimensions | |
| Overall dimensions L*W*H (mm) | 8050*2500*3255 |
| Cab height (mm) | 3150 |
| Wheelbase (mm) | 2600 |
| Track width (mm) | 1955 |
| Minimum ground clearance (mm) | 430 |
| Rear swing radius (mm) | 2365 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.