
Wheeled Excavator
✔ Equipped with the YCF3065 engine, rated power 48KW/2200rpm, strong output, suitable for heavy-duty operations.
✔ 0.3m³ standard bucket capacity, maximum bucket digging force 45KN, high work efficiency.
✔ 24MPa hydraulic system pressure, stable and responsive under all working conditions.
✔ Low fuel consumption, 145L large fuel tank supports long continuous operation.
✔ Uses world-renowned brand hydraulic components, stable performance and long service life.
✔ Four-wheel drive design, 0-30km/h travel speed, strong off-road performance.
✔ Full hydraulic steering, flexible and convenient operation in narrow workspaces.
✔ Buffer cylinders reduce vibration, impact and noise, extending part service life.
✔ Reinforced chassis and wheel reduction axle, high durability and stability.
✔ Integral welded boom, professionally treated, sturdy and crack-resistant.
✔ Wear-resistant steel bucket with thickened steel plate, suitable for heavy-duty construction operations.
✔ 7500kg operating weight, balanced structure, stable digging and lifting.
✔ Maximum digging depth: 3900mm, maximum digging radius: 6300mm.
✔ Maximum digging height: 6380mm, maximum dumping height: 4700mm.
✔ Maximum climbing angle 25°, strong adaptability to various terrains.
✔ Compact structure, small turning radius, suitable for urban and narrow construction sites.
✔ Ergonomic control layout, comfortable operating experience for long working hours.
✔ Fully enclosed cab, wide field of view, equipped with air conditioning and heating.
✔ Filters arranged at ground level, convenient and quick maintenance and replacement.
✔ 110L hydraulic oil tank, reasonable design, low maintenance cost.
| Performance Parameters | |
| Bucket capacity (m³) | 0.3 |
| Swing speed (rpm) | 0-12 |
| Maximum climbing angle (°) | 25 |
| Maximum bucket digging force (kN) | 45 |
| Maximum arm digging force (kN) | 36 |
| Engine model | YCF3065 |
| Power/speed (kW/rpm) | 48/2200 |
| Tire model | 8.25-16 |
| System pressure (MPa) | 24 |
| Operating weight (kg) | 7500 |
| Ground pressure (kPa) | - |
| Working range | |
| Maximum digging height (mm) | 6380 |
| Maximum dumping height (mm) | 4700 |
| Maximum digging depth (mm) | 3900 |
| Maximum vertical digging depth (mm) | 2700 |
| Maximum digging radius (mm) | 6300 |
| Minimum swing radius (mm) | 2408 |
| Maximum dozer blade ground clearance (mm) | 370 |
| Maximum dozer blade cutting depth (mm) | 110 |
| Overall dimensions | |
| Overall dimensions L×W×H (mm) | 6390 × 2175 × 2880 |
| Cab height (mm) | 2880 |
| Wheelbase (mm) | 2400 |
| Track width (mm) | 1665 |
| Minimum ground clearance (mm) | 260 |
| Tail swing radius (mm) | 2080 |
| Travel system | |
| Travel speed (km/h) | 0-30 |
| Drive type | Four-wheel drive |
| Steering type | Full hydraulic steering |
| Fluid capacities | |
| Fuel tank capacity (L) | 145 |
| Hydraulic oil tank capacity (L) | 110 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.