
Wheeled Excavator
✅ Equipped with a well-known domestic brand engine for strong power and efficient operation.
✅ Optimized matching design and advanced energy-saving control effectively reduce fuel consumption.
✅ New cooling fan and large muffler ensure low-noise operation.
✅ Built-in advanced turbocharging technology greatly improves high-altitude adaptability.
✅ Unique funnel-shaped fan shroud increases air intake and heat dissipation efficiency for stable, continuous, and efficient operation.
🔩 The main pump, main valve, swing motor, travel motor, cylinders, and pilot control valve all use world-renowned brand components to ensure reliable overall quality.
🔩 Integrated latest technology reduces energy consumption and achieves faster response.
🔩 Powerful and precise swing control: optimized vibration absorption for stable and accurate swing stopping; increased torque reserve provides stronger swing power.
🔩 Cushioned hydraulic cylinders: the boom, arm, and bucket cylinders are all equipped with cushioning to reduce vibration and impact, lower noise, and extend service life.
🔩 Dual-pump confluence technology increases oil flow to the working cylinders and greatly improves work efficiency.
💪 Reinforced chassis, hydraulic steering, and wheel reduction axle enhance flexibility and durability.
💪 Forged structures at key arm hinge points reduce stress and extend service life.
💪 Fully welded boom and arm are bored and shot-blasted to enhance structural strength and avoid welding cracks.
💪 Bucket cutting plate uses special wear-resistant steel plate, paired with durable bucket teeth and side teeth, suitable for heavy-duty operations.
💪 Thickened steel plates and side reinforcement plates improve overall wear resistance.
💪 Flat-bottom bucket ensures neat ground leveling results.
👀 Large front, side, and rear windows expand panoramic visibility, reduce blind spots, and make operation safer and more efficient.
👀 Large skylight improves upward visibility and ventilation; equipped with tempered glass windows with sun visors.
🎛️ All control levers and buttons are arranged according to ergonomic design.
🎛️ Lightweight and flexible joysticks for easy control.
🏆 Fully enclosed luxury cab with LCD display and comfortable luxury seat.
❄️🔥 Built-in air conditioner and heater for rapid cooling and heating inside the cab.
📊 Large-screen multifunction LCD monitor digitally displays real-time operating data such as engine speed, water temperature, and oil pressure.
🔘 Centralized control panel with touch buttons for simple function switching.
🗺️ Equipped with GPS positioning system, supporting remote diagnostics, fault warnings, and automatic maintenance reminders.
🔄 Oil filter, pilot filter, fuel filter, and water separator are placed within ground-level reach for easy replacement.
⛽ Large-capacity fuel tank supports long continuous operation.
🧰 Extra-large toolbox provides ample storage space for spare parts.
⏱️ High-quality core components extend service cycles and reduce routine maintenance frequency.



| Performance Parameters | |
| Bucket capacity (m3) | 0.3 |
| Swing speed (rpm) | 0-12 |
| Maximum gradeability (°) | 25 |
| Bucket digging force (KN) | 45 |
| Arm digging force (KN) | 36 |
| Engine model | YCF3065 |
| Power / rated speed (KW/rpm) | 48/2200 |
| Tire model | 8.25-16 |
| System pressure (MPa) | 24 |
| Working Range | |
| Maximum digging height (mm) | 7154 |
| Maximum dumping height (mm) | 5330 |
| Maximum digging depth (mm) | 3765 |
| Maximum vertical digging depth (mm) | 2726 |
| Maximum digging radius (mm) | 6178 |
| Minimum swing radius (mm) | 1737 |
| Overall Dimensions | |
| Overall dimensions L*W*H (mm) | 6308*2238*2718 |
| Cab height (mm) | 2718 |
| Wheelbase (mm) | 2399 |
| Track gauge (mm) | 1694 |
| Minimum ground clearance (mm) | 260 |
| Rear swing radius (mm) | 1797 |

Compare diesel crawler dozers from SD10 to SD46 by ground conditions, push distance and shift length. Explore tracks, blades and rippers for grading and mine work.
© 2026 Rockway Diesel Dozers All rights reserved.